Skyzai Pay POS
Current public-DAV authority boundary — 2026-07-12. Pre-launch target design; nothing here proves a live system.
A public-DAV consequence may occur only when at least two natural-person councilors bind the exact consequence in a complete valid bound PRISM decision receipt.
PRISM records and verifies that receipt only; it never serves as council, signatory, authority, or receipt producer.
AI and caste seats stage unsigned proposals only; they never authorize or execute a public-DAV consequence. Constitution or membership adoption establishes constitution and membership only; it does not authorize a later consequence. Policy may constrain an unsigned proposal but never authorizes execution or substitutes for the complete consequence-bound receipt.
Before receipt validity, consequence fails closed to read-only proposal, simulation, or deterministic sandbox; live evidence remains gated_pending_complete_valid_bound_receipt.
Software deterministically carries out only the exact consequence bound to a complete valid bound PRISM decision receipt from at least two natural-person councilors binding that exact consequence.
Scope: stable Work POS compatibility reference. Its settlement capability is parked and merges into Twins; this is not a standalone SKU or current offer. See The Product Family.
Current route: skyzai.com/work/pos/
Canonical active source:
02_SKYZAI/04_PROGRAMME_AND_PROOF/TECHNICAL_DOCS/declarative/schemas/product_faces.yaml → work_pos
Status: [D] target design; nothing live
Current disposition
POS is a parked compatibility surface for receipt-native checkout design. A Natural buyer authorizes the payer act; the Legal merchant separately acts through lawful external authority and its required executor. The two acts must match their own authorization bindings before bilateral settlement evidence can exist.
No checkout or settlement is live. The O3 Twins proof must first demonstrate a lawful merchant, distinct executor, unaffiliated Natural payer, bilateral reconciliation, and repeat payer. POS cannot bypass or substitute for that gate.
What It Is Not
- Not a payment institution claim
- Not a bank, card network, or licensed acquirer
- No custody overclaim — the rail handles settlement; we record the evidence
- No guaranteed settlement beyond what the rail itself provides
- No hidden consumer fee — η = 0 on the consumer path
Cross-links
- Compatibility route:
/work/pos/ - O3 commerce home:
/work/twins/ - Adjacent canon: POS Commerce OS (94), API Pay (P0), OFN Receipts (P1)
- Machine canon:
02_SKYZAI/04_PROGRAMME_AND_PROOF/TECHNICAL_DOCS/declarative/schemas/product_faces.yaml
Older
/products/pay-pos/material is K3 history, not current topology or availability.
Zero-Sum Resolution Equation
K3 public-DAV authority history — 2026-07-12
K3 historical reference — not active authority
Current public-DAV boundary — 2026-07-10. Pre-launch target design; nothing here is live. The active DAV is public and targets PRISM, with no K2 runtime, launch, genesis/bootstrap, or fallback dependency. Consequential authority requires at least two natural-person councilors; AI/caste seats stage unsigned proposals only. Before quorum, behavior fails closed to read-only/proposal, simulation, or deterministic sandbox, and a live decision receipt remains gated pending quorum.